Access the Full Project by Clicking here!
Bidjugde
JOB
Avalon Blvd Pavement Reconstruction I-405 Freeway
BID DATE
07/17/14 - 10:00
AGENCY
Carson
ESTIMATE
$2,350,000
SCOPE
Pavement Restoration for Avalon Blvd. from 405 FWY to 223rd Street and From Dominguez Street to Victoria Street by reconstruction of existing pavement section and overlay with Asphalt Rubberized Hot Mix (ARHM). Work includes furnishing all labor, material, equipment, services, and incidentals required for the restoration of Avalon Blvd, including : Cold milling 2.25” existing A.C. pavement surface course ; laying 3/4” leveling Course and 1.5” ARHM Finishing Course; Cleaning road surface, installation of temporary pavement markers and replacing raised markers, applying traffic striping, markings and legends to match existing condition after completion of (ARHM) overlay, adjust Manhole covers, valve covers to grade ; installation of loop detectors and removing and replacing Pavement Section, Curb & Gutter, Driveway, sidewalks, access ramps and other related work . Rick Boutros City of Carson 701 E Carson St Carson, CA 907452224 Tel:(310) 952-1700 x1830 Fax:(310) 835-5749 rboutros@carson.ca.us

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT