Sanitary Sewer Rehabilitation Replacement Program 7
BID DATE
10/14/21 - 3:00
AGENCY
Long Beach
ESTIMATE
$641,876
SCOPE
The Work consists of furnishing all labor, equipment and materials necessary to rehabilitate approximately 12,041 lineal feet of vitrified clay pipe. The work includes, but is not limited to, CCTV inspections, cleaning and lining 8-inch - 18-inch pipe, 8-inch to 10-inch sewer pipe point repairs, removing and replacing sections of existing 8-inch sewer, restoring existing sewer laterals after repair/lining, root removal, installation of “top hat’ repairs. The work will require temporary public notification, sewer bypass facilities and traffic control. https://pbsystem.planetbids.com/portal/15810/bo/bo-detail/86718 Matthew.Cruz@lbwater.org
PREBID
9/28/2021 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION