Access the Full Project by Clicking here!
Bidjugde
JOB
Katy Townhomes Lift Station
BID DATE
09/28/21 - 11:00
AGENCY
Ventana Development
ESTIMATE
$550,000
SCOPE
The work consists of providing the necessary labor, materials, equipment, and supervision to construct Katy Townhomes Lift Station including but not limited to mobilization, bonds and insurance; construction of an 6-foot (6') diameter pre-cast concrete wet well, complete with two (2) submersible pumps with all accessories, riser piping, valves, coatings, fence and gates, site work, concrete pavement, on-site sanitary sewer piping including well pointing and dewatering as necessary, on-site manhole, on-site force main, water line, 40-kW diesel engine generator, sound attenuated weatherproof level 2 enclosure and 24-hour integral storage tank, generator concrete pad, automatic transfer switch, load bank testing, lift station control panel, automatic telephone dialer, electrical service disconnect switches, conduit, wire; trench safety system at all depths; Storm Water Pollution Prevention Plan implementation, maintenance, and record keeping; and all else as shown on the construction drawings and detailed in the specifications for a fully functioning lift station; and all else shown on the construction drawings and detailed in the specifications for the off-site sanitary sewer to discharge to the existing system. https://www.civcastusa.com/project/613a3bd3588721b3217f0c1e/summary cryoung@jonescarter.com
PREBID
9/14/2021 11:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT