Access the Full Project by Clicking here!
Bidjugde
JOB
Davis Camp Waterlines Phase 4 (REBID)
BID DATE
12/7/21 - 2:00
AGENCY
Mohave County
ESTIMATE
$300,000
SCOPE
Premier Backhoe - $347,852 Davis Camp Phase 4 installation of new 6-inch, 8-inch, and 10-inch diameter C900 PVC Water Main to replace the existing water distribution pipe within the RV Park where shown on the plans and in accordance with these Technical Specifications. The existing water line to be replaced is believed to be predominately asbestos cement (AC) pipe. MichaM@mohave.gov
UPDATES