Access the Full Project by Clicking here!
Bidjugde
JOB
Traverse Transmission Line Improvement
BID DATE
09/23/21 - 1:00
AGENCY
Draper
ESTIMATE
n/a
SCOPE
The scope of this project will be to provide all the labor, materials, tools and equipment necessary to remove six existing valve vaults and manholes and to replace 24” welded steel pipe, construct two new mainline valve vaults and one new check valve vault adjacent to the existing pipeline, and to install a cathodic protection system with test stations along the 24” Traverse Transmission Line (TTL) as described in the project plans and specifications. Eric Lundell +1 801-576-6365 eric.lundell@draper.ut.us
PREBID
9/14/2021 1:30

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT