Access the Full Project by Clicking here!
Bidjugde
JOB
La Palma Avenue Tustin Avenue Water Main Replacements OCTA Railway Crossing
BID DATE
09/23/21 - 2:00
AGENCY
Anaheim
ESTIMATE
n/a
SCOPE
The work to be undertaken consists of a bore and jack operation at La Palma Avenue Railroad Crossing for a 12-inch ductile-iron carrier pipe (151 linear feet) within a 24-inch steel casing (145 linear feet) and a 36-inch ductile-iron carrier pipe (123 linear feet) within 48-inch steel casing (145 linear feet). The work will also consist of a bore and jack operation at Tustin Avenue Railroad Crossing for a 12-inch ductile-iron carrier pipe (141 linear feet) within 24-inch steel casing (126 linear feet). Due to OCTA’s plan to expand its railways along La Palma Avenue and Tustin Avenue, the project is required to protect the pipes and increase service reliability at the existing water main located at the crossings. Patrick Kelley 714-765-5272 pkelley@anaheim.net https://pbsystem.planetbids.com/portal/14424/bo/bo-detail/85753#bidInformation
PREBID
9/15/2021 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT