Access the Full Project by Clicking here!
Bidjugde
JOB
Ruins Road Repair
BID DATE
09/30/21 - 10:00
AGENCY
Aztec
ESTIMATE
n/a
SCOPE
A. Preparation of an alternate traffic control plan for City approval, if desired. B. Provide and install all signage and control devises as shown on the Drawings or as directed by the approved alternate plan. C. Provide all labor including flaggers needed to implement the traffic control plan D. Upon completion of construction, remove all traffic control signage devises and clean any collected grit, gravel or debris gathered around the devises. 2. Roadway, Drainage Piping and Sidewalk Repair A. This is a lump sum bid item that includes the following tasks: B. Cut, remove and dispose of the asphalt, curb and sidewalk as shown on the Drawings. C. Excavate, remove and dispose of the soil around the inlet as shown on the drawings D. Repair the storm drainage piping connected to the inlet as shown and described in the Drawings. E. Provide, place and compact the fill material around the inlet as specified and shown on the Drawings. GEOMAT will perform the required compaction testing. F. Perform base preparation and provide and install all materials to restore the sidewalk and road surface as shown and described in the Drawings. G. Clean up the sidewalk and roadway in the vicinity of the roadway repair https://vrapp.vendorregistry.com/Bids/View/Bid/180b6ca5-f46b-40da-952b-9f486ac50f58

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT