(CMAR) Val Vista Water Transmission Main Phase 3
BID DATE
01/20/15 - 3:00
AGENCY
Mesa
ESTIMATE
$11,000,000
SCOPE
PER MESA REP 1/7/15, NO INFO UNTIL END OF FEB: NEG ARE A WAYS OUT PER CITY REP 8/7/14: The Phase 2 project begins on Brown Road at approximately 24th Street where it connects to the end of Phase 1 that is currently under construction. A new 60-inch waterline will extend west approximately 2.8 miles (~14,660LF) along Brown Road to west of Mesa Drive (Pasadena Street) where it intersects and ties into the existing 42-inch line leading south to the Pasadena pump station (601 N. Pasadena). Phase 2 must be constructed and be operational no later than December 1, 2015. Phase 3 begins west of Mesa Drive at approximately Pasadena Street where is connects to the end of Phase 2. A new 48-inch waterline will extend to the west approximately 2.6 miles (~13,600 LF) along Brown Road to Country Club Drive, south on Country Club Drive and finally west along Rio Salado to approximately Longmore Street where it intersects and ties into the existing 42-inch line leading south to the Brooks Pump Station (310 S. Brooks). Phase 3 must be constructed and be operational no later than December 1, 2016. Michele.davila@mesaaz.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT