Sara Park Waterline Improvements
BID DATE
07/31/14 - 3:00
AGENCY
Lake Havasu
ESTIMATE
$1,000,000
SCOPE
The Project consists of the installation of approximately 9,670 linear feet of 8-inch pipe from the existing Dog Park on the north side of the loop to the existing Ball Fields on the south side of the loop, installation of approximately 4,185 linear feet of 8-inch pipe from Silver Clipper Lane to the Rodeo Grounds entrance, installation of approximately 2,540 linear feet of 6-inch pipe around the Ball Field loop, installation of a PRV on the proposed Zone 4 6-inch waterline that will open during low pressures in the SARA Park Zone 3 system. The City has determined that a portion of these improvements shall be separated into additive alternates, as described in these Project documents. Kim Fiumara, fiumarak@lhcaz.gov , Sean Perrotto at Sean.Perrotto@Atkinsglobal.com