Access the Full Project by Clicking here!
Bidjugde
JOB
FY22 Pavement Reconstruction Phase 1
BID DATE
09/9/21 - 2:00
AGENCY
Prescott
ESTIMATE
n/a
SCOPE
The project generally consists of pulverizing and blending in place the existing asphalt pavement surface, base preparation of recycled base material and placement of new asphalt concrete atop. The roadways included in the project are: Prescott Heights Drive, Campbell Avenue, Flora Street and Black Drive. The work includes pavement repairs, the adjustment of utility covers to finish grade, some minor drainage repairs and the restoration of disturbed traffic striping.
PREBID
8/30/2021 1:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT