Access the Full Project by Clicking here!
Bidjugde
JOB
Transmission Distribution Waterline Improvements
BID DATE
09/15/21 - 3:00
AGENCY
Hutto
ESTIMATE
n/a
SCOPE
This project involves installation of approximately 3,650 feet of 24-inch and 5,725 feet of 30-inch waterline along the south side of Hwy 79, installation of approximately 16,000 feet of 16-inch waterline parallel to the existing HOT transmission line between TX 95 and FM 973, and installation of 5 pressure reducing valves (PRVs) throughout the distribution system. https://www.civcastusa.com/project/61152b41229da3b488ff6efe/summary cgagne@dcs-engineering.com
UPDATES