Access the Full Project by Clicking here!
Bidjugde
JOB
Alta Vista Sewer Pump Station
BID DATE
09/23/21 - 9:00
AGENCY
Redondo Beach
ESTIMATE
$4,000,000
SCOPE
The scope of work comprises without limitation, furnishing all necessary labor, materials, equipment, other incidental and appurtenant work necessary to construct Alta Vista Pump Station, Force Main, and Sanitary Sewer Improvements, including, but not limited to construction of precast six-foot (6) diameter concrete wet well pump station inclusive of 3.5 hp submersible duplex pumps, valve vault, electrical control cabinet, emergency power generator and bypass pumping con- nection, and associated site work; Furnish and installing seven (7) manholes one (1) drop manhole and associated frame and covers; 900 LF- 8” VCP sanitary sewer; 400 LF- 4” DI PVC force main; one (1) 50-kW Diesel generator; service rack; lift station control panel; automatic transfer switch; electrical conduit and wiring; load bank testing; electrical service; SCE, ATS, MTS, MCC, new PLC and SCADA system, disconnect switches and all else as shown the construction drawings and detailed in the specifications for a fully functioning facility. planholders@redondo.org geraldine.trivedi@redondo.org
PREBID
9/1/2021 9:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT