Miscellaneous Water Vault Rehabilitations (REBID)
BID DATE
12/23/21 - 2:00
AGENCY
Anaheim
ESTIMATE
$900,000
SCOPE
Arnaz Engineering Contractors - $1,022,079 Vido Samarzich - $1,078,100 Minco Construction (Minako) - $1,201,300 MLC Constructors - $1,394,620 TE Roberts Inc. - $1,521,467 Caliagua - $1,660,800 This work consists of the rehabilitation of four (4) water transmission line vaults, to include replacement of valves, piping, fittings, and connections to existing concrete cylinder pipe (CCP) ranging from 14-inches through 36-inches in diameter. Other elements include vault structural and electrical improvements, lead based paint testing and abatement if needed, asphalt paving, sidewalk, curb & gutter, landscaping disturbed by construction and any appurtenant work needed to complete project scope. https://pbsystem.planetbids.com/portal/14424/bo/bo-detail/85774 jjordan@anaheim.net