Access the Full Project by Clicking here!
Bidjugde
JOB
Ritchey St Water Main Relocation Pressure Reducing Station Relocation SR 55 Water Crossing
BID DATE
10/19/21 - 2:00
AGENCY
Santa Ana
ESTIMATE
$6,400,000
SCOPE
Ritchey St Water Main Relocation, Project No. 19-6438: This work is for the relocation of the existing 16-inch water main in Ritchey Street. Approximately 260 feet will be new 8-inch DR14 C900 PVC pipe connecting to the existing water system on the west side and at Newport Circle, and about 1,444 feet will be new 16-inch DR18 C905 PVC pipe, and about 120 feet of new 16-inch Class 250 DIP to replace the existing piping within Ritchey Street within the limits noted on the Plans. The proposed water main will reconnect existing commercial services, construct new fire hydrants, and reconnect existing fire department connections as well as all connections to the existing water system. This work will also include construction of concrete encasement for thrust restraint, installation of a 16-inch line stop, abandoning the existing 16-inch water main, potholing of crossing utilities and points of connection, establishing traffic control during construction, repaving the roadway and restriping new pavement. https://pbsystem.planetbids.com/portal/20137/bo/bo-detail/85663 Armando Fernandez (714) 647-3316 afernandez@santa-ana.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT