Access the Full Project by Clicking here!
Bidjugde
JOB
Santa Ana Mainstem Prado Dam River Road Dike
BID DATE
09/3/21 - 1:00
AGENCY
Department Defense
ESTIMATE
$10,000,000
SCOPE
The project is a 1,750 linear feet earthen filled dike flood control structure. The earthen filled dike will have a crest width of 21 feet and crest elevation 567.00 feet at the control line of the dike. This results in a maximum dike height of approximately 18 feet. The dike will have side slopes of 2.25 horizontal to 1 vertical (2.25H:1V). The interior drainage will discharge through two 48 inch diameter reinforced concrete pressure pipes locate at Sta. 4+60. Secant pile walls will be constructed at the tie in locations adjacent to existing residential properties. https://sam.gov/opp/a252b015830b4b6aad6a96f1fa00ef88/view
UPDATES