Access the Full Project by Clicking here!
Bidjugde
JOB
(CMAR) Lift Station 2 Upgrades 67th Ave ACDC
BID DATE
12/14/21 - 2:00
AGENCY
Glendale - AZ
ESTIMATE
$3,500,000
SCOPE
1. Demolition of existing site fence and gates, all buried and above ground well piping, electrical gear, wet well top slab, lift station pumps, driveway, lift station piping and flow meter on multiple floors of the pump station building. 2. Site grading, drainage improvements, and pavement. Site work may also include a new CMU site wall and steel gates 3. The installation of new submersible pumps, discharge piping, valves, flow meter and new wet well top slab. 4. Wet well grout and coating replacement. 5. Waterline improvements. 6. Electrical, instrumentation, and controls (EIC) upgrades for the new submersible pump system, including a new service entrance section and generator. 7. All required bypass pumping. 8. Any additional work as required or indicated in the project drawings. EngineeringDept@glendaleaz.com
UPDATES