Access the Full Project by Clicking here!
Bidjugde
JOB
Sunterra Lift Station Number 1
BID DATE
08/26/21 - 11:00
AGENCY
Harris Waller County MUD
ESTIMATE
n/a
SCOPE
The work consists of providing the necessary labor, materials, equipment, supervision, and plant to construct Sunterra Lift Station No. 1 for Harris-Waller Counties Municipal Utility District No. 5, including, but not limited to: ten foot (10’) diameter cast-in-place concrete wet well, wet well vent and bollards; two (2) submersible pumps with guide rails, piping, fittings, valves, pipe supports, and pump lifting chains; on-site concrete access driveway; diesel generator, with sub-base fuel tank and slab; service rack and control panel with slab; eight foot (8’) brick fence with sliding/swing gate and pedestrian gate; water service line, backflow preventer and hose bibb; junction manhole and influent sewer lines; all electrical facilities including junction boxes, autodialer, floats, transducer, conduits and conductors; and all else specified and shown in the contract documents required for a complete and functioning lift station. https://www.civcastusa.com/project/610d342558872155516529c1/summary cryoung@jonescarter.com
UPDATES