Proposed 36 inch Water Line Centerpoint Energy Corridor Trickey Rd
BID DATE
08/31/21 - 2:00
AGENCY
North Harris County Regional Water Authority
ESTIMATE
n/a
SCOPE
This North Harris County Regional Water Authority (NHCRWA, Authority) Project includes the installation of approximately 8,740 linear feet of a 36-in. steel water transmission line, known as Project 25E. The proposed transmission line runs generally in the north-south direction and will be a secondary feed into the existing Spears Road Regional Pump Station from the future installation of the 84-in. water transmission line (Project 25D) along North Sam Houston Beltway 8. The project limits span the permitting agencies of the City of Houston, Texas Harris County Flood Control District, and Harris County, Texas. Permitting and coordination will need to occur with these agencies. https://www.civcastusa.com/project/610c29849eb894d7e40d7ffa/summary Melissa.Ramos@aecom.com
PREBID
8/17/2021 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT