Access the Full Project by Clicking here!
Bidjugde
JOB
Memorial Parkway Hike Bike Trail
BID DATE
08/19/21 - 2:00
AGENCY
Portland
ESTIMATE
n/a
SCOPE
The work consists of installing a 10-ft. wide bi-directional usage concrete Hike and Bike Trail along the Memorial Parkway grassed median beginning at the Eastside of Wildcat Drive (FM 2896) for approximately 1,932 linear feet towards Billy G. Webb Drive. The project includes preparation of existing roadway grassed medians, including approximately 20,097 square feet of reinforced concrete Hike and Bike Trail, ADA ramps, minor public utility structure adjustments to meet the proposed grades, various erosion control measures, traffic control plan and all related signage, striping and crosswalks to meet ADA compliance. LJAsouthcc@lja.com https://www.portlandtx.com/bids.aspx?bidID=20
PREBID
7/27/2021 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT