Access the Full Project by Clicking here!
Bidjugde
JOB
FM 2642 Utility Relocations
BID DATE
07/29/21 - 2:00
AGENCY
Royse City
ESTIMATE
n/a
SCOPE
Major items include 200-LF of 4-inch AWWA C900 (DR 18) PVC water line in 8-inch Sch. 40 steel encasement by bore, 91-LF 1-inch AWWA C901 (DR-9) HDPE water line in 4-inch Sch. 40 steel encasement by bore, 433-LF of 4-inch AWWA C900 (DR 18) PVC water Line by open cut, 1,287-LF 2-inch Sch. 80 PVC water line, 102-LF AWWA C901 (DR-9) HDPE water service line and 4 connections to existing water lines. sallen@bhcllp.com https://www.civcastusa.com/project/60f099113eea6a32f4b2b8e9/summary

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT