Access the Full Project by Clicking here!
Bidjugde
JOB
South Valley Water Supply Treatment
BID DATE
09/2/21 - 2:00
AGENCY
Lower Rio Grande PWWA
ESTIMATE
n/a
SCOPE
The Project consists of the following: drilling and completing a 750 gpm groundwater production well, and line-shaft pump and motor. Installation of a 750 gpm arsenic filtration system within a 2,000 sf CMU building, concrete sludge drying beds, and miscellaneous facility site work. Installation of a 250,000-gallon welded steel water storage tank at the existing tank site with miscellaneous site work improvements. Modification of the existing SCADA to incorporate the new arsenic plant SCADA to communicate to the storage tank site, PRV, and central master terminal. karen.nichols@lrgauthority.org
PREBID
8/19/2021 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT