Access the Full Project by Clicking here!
Bidjugde
JOB
Packery Channel Restoration
BID DATE
09/15/21 - 2:00
AGENCY
Corpus Christi
ESTIMATE
n/a
SCOPE
The Packery Channel Restoration Project consists of repairs to shoreline protection and related appurtenances at Packery Channel, a tidal channel connecting Corpus Christi Bay to the Gulf of Mexico that supports recreational boat traffic. Work includes: Demolition and removal of damaged articulating block mat revetment, concrete walkway, and bollard/cable barriers; Construction of riprap revetment; Placement of riprap as toe protection along the landside section of two jetties; Re‐setting displaced riprap and armorstone blocks along two jetties; Construction of new concrete walkway; Construction of a drainage swale lined with concrete block mats; Improvements to five existing storms drains; Construction of five new storm drains; Replacement of a section of aluminum handrail along one jetty as per the attached plans and specifications. https://www.civcastusa.com/project/6100860bb8c5c002890b4b76/summary clarissaj@cctexas.com
UPDATES