Access the Full Project by Clicking here!
Bidjugde
JOB
Rivulon Infrastructure Improvements
BID DATE
09/16/21 - 1:00
AGENCY
Hubbard Engineering
ESTIMATE
n/a
SCOPE
This contract shall be for furnishing (unless otherwise indicated) all labor, materials, transportation, services, taxes, and coordination for the construction and on site installation of all improvements shown on the documents, including, but not limited to demolition of existing irrigation facilities, construction of Salt River Project above grade ditches, below grade pipes and structures, and demolition and construction of private irrigation ditches, demolition of existing pavement and curbs, installation of new pavement, concrete curbs, concrete walks, utilities, irrigation and landscaping, street lights, traffic signal conduits, sewer, water, drainage, private irrigation main, and dry utilities, slurry seal, stripping, traffic control, and all required construction as shown on the construction documents. aquinod@nationwide.com gbrown@hubbardengineering.com
PREBID
8/26/2021 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT