Access the Full Project by Clicking here!
Bidjugde
JOB
Pinnacle Peak Road 45th Ave 35th Ave Paving Storm Drain Improvements (REBID)
BID DATE
08/17/21 - 2:00 LIVE!
AGENCY
Phoenix
ESTIMATE
$8,236,741
SCOPE
ORG RESULTS: Combs Construction Co. - $7,494,528 T&T Construction - $7,558,599 Achen Gardner Construction - $8,475,430 NGU Contracting - $8,763,649 FNF Construction - AZ - $8,922,695 Standard Construction Co. Inc. - $9,226,154 The project consists of constructing new roadway paving and storm drain improvements on Pinnacle Peak Road from 45th Avenue to just west of 35th Avenue, and constructing a new storm drain on 43rd Avenue extending north from Pinnacle Peak Road to Misty Willow Lane. The work includes: subgrade preparation and constructing new asphaltic concrete roadway pavement; new concrete curb and gutter, ADA compliant concrete sidewalk, curb returns, concrete driveway entrances; new concrete box culvert crossings, concrete wing walls, concrete headwalls with brick veneer facing, concrete channel lining, new storm drain mainline pipe, storm drain manholes, storm drain connector pipes and catch basins; trenching for underground street light circuits; installation of new traffic signal poles, signal equipment, and traffic signal conduits; installation of new LED street lights and LED luminaires; new landscaping and irrigation system, decomposed granite landscape ground cover; and other required work items. https://solicitations.phoenix.gov/Solicitations/Details/1023
PREBID
7/29/2021 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT