Access the Full Project by Clicking here!
Bidjugde
JOB
Lake Tahoe Boulevard Class I Bicycle Trail (REBID)
BID DATE
11/15/21 - 10:00
AGENCY
South Lake Tahoe
ESTIMATE
$3,900,000
SCOPE
Sierra Nevada Const SNC - $4,894,007 Work to be performed includes, but is not limited to: traffic control, demolition of existing AC pavement, PCC curbs, gutters, and ADA ramps, construction staking, grading, compaction, new concrete curb & gutter, ADA concrete ramps, storm drain system construction (drainage inlets, manholes, yard drains, storm drain laterals, storm drain main), electrical conduit, electrical pull boxes, standard City of South Lake Tahoe streetlights, AC paving, pavement striping, signage, landscaping, irrigation, installing revegetation and/or sod on areas disturbed by construction activity, Best Management Practices, compliance with regulatory permits, establishing vegetation on areas disturbed by construction activity, and all other work as described in the Contract Documents, including, without limitation, project construction drawings, bid documents, Special Provisions, City of South Lake Tahoe Public Improvements and Engineering Standards, and the 2018 edition of the California Department of Transportation, Standard Specifications and Standard Plans inclusive of Revised Standard Specifications through time of Project Bid. Randy Carlson/(530) 542-6033 rcarlson@cityofslt.us https://pbsystem.planetbids.com/portal/14997/bo/bo-detail/87751
UPDATES