Access the Full Project by Clicking here!
Bidjugde
JOB
Alessandro West Improvements Phase II
BID DATE
08/11/21 - 2:00
AGENCY
Palm Desert
ESTIMATE
n/a
SCOPE
The project will rehabilitate a roadway. The general items of work to be done hereunder consist of mobilization; traffic control; dust and water control; saw cutting; removal of asphalt concrete, concrete improvements, and base material; clearing and grubbing; install HDPE storm drain system; constructing road base material, asphalt concrete pavement, curb, curb and gutter, cross gutter, and ADA curb ramps; signing and striping; and adjusting manholes and valves to grade. https://pbsystem.planetbids.com/portal/40288/bo/bo-detail/85286#bidInformation Mariana Rios 760-346-0611 x.448 mrios@cityofpalmdesert.org , rgayler@cityofpalmdesert.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT