Access the Full Project by Clicking here!
Bidjugde
JOB
CMUD Reclaimed Water Line Phase 3B
BID DATE
08/3/21 - 10:00
AGENCY
Champions MUD
ESTIMATE
n/a
SCOPE
Work Covered by Contract Documents: Installation of 3-inch Purple reclaimed water line including bends and fittings. Installation of 6-inch Purple reclaimed water line, by open cut and trenchless construction, including bends and fittings. Installation of 12-inch steel casing, by trenchless construction, including bends and fittings. Installation of 6-inch gate valve and box. 6-inch wet connections to existing reclaimed water system. Installation of air release and vacuum relief valve with manhole. 3-inch wet connection to existing irrigation backflow preventer, including disconnection, plug, and isolation of existing potable water line connection. Installation of 3” backflow preventer and 3” gate valve with connection to new 3” reclaimed water line and connection to existing irrigation line, including all bends and fittings. Trench safety as required per Section 01561. Implementation and maintenance of traffic control plan. Site restoration including removing and replacing concrete sidewalks, driveways, removing and replacing asphalt pavement, damaged fences, turf, plants, trees, and shrubs. https://www.civcastusa.com/project/60eedf662075c216a80df8ab/summary rbfleischer@lan-inc.com
PREBID
7/27/2021 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT