Access the Full Project by Clicking here!
Bidjugde
JOB
Myers St Recycled Water Pipeline Crossing Florida Ave
BID DATE
08/23/21 - 5:00
AGENCY
Eastern Municipal WD
ESTIMATE
$130,000
SCOPE
The work comprises construction of a recycled water pipeline and appurtenances including, but not limited to the following: furnishing, delivery and installation of approximately 315 feet of 6-inch diameter HDPE including, valve, blow-offs, air valves, connections to existing recycled water mains with valves and associated removals as needed; trench sheeting, shoring and bracing per California Labor Code; import of required backfill material; pavement removal, replacement and restoration per encroachment permits; furnishing, delivery, approximately 250 feet of 12-inch HDPE casing by directional drilling; hydro-static testing, miscellaneous testing, coordination regarding pipeline connections and field start-up and all the necessary appurtenances to complete the pipeline in place, an in accordance with the contract technical specifications and contract drawings. eichpera@emwd.org
PREBID
7/27/2021 9:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT