2020 Annual Storm Drain Improvement
BID DATE
07/29/21 - 2:30
AGENCY
San Carlos
ESTIMATE
$500,000
SCOPE
The scope of work generally includes mobilization, traffic control, water pollution control, dust prevention and control, site cleanup, potholing, installing new storm drain pipe by horizontal directional drilling (HDD), or open trench method (as specified on plans), subdrain pipe, abandoning existing storm pipe, storm drain inlet installation, manhole installation, installing dry-cast concrete retaining wall, removing & installing new storm headwall, installing bollards, rip rap, installing aggregate base, and all other work as shown on the Plans and as called for in the Technical Provisions and as directed by the Engineer vpatel@cityofsancarlos.org