Access the Full Project by Clicking here!
Bidjugde
JOB
WWTP Holding Pond Liner
BID DATE
06/3/14 - 2:00
AGENCY
Brentwood
ESTIMATE
n/a
SCOPE
Furnishing all labor, materials, equipment, and performing all work necessary and incidental to the construction of the project known as WWTP Holding Pond Liner, CIP Project No. 592-59199, according to drawings and specifications as prepared by the City of Brentwood and according to the Contract Documents. The work includes pond earthworks excavation, embankment and stock pile, transfer yard embankment fill and compaction, geotextile fabric, class II aggregate base, pump station with inlet, force main, electrical and scada controls, pond liner, non-potable water pipe and risers, drainage works, SWPPP/erosion control, complete and in satisfactory condition, all as shown on the plans and/or as specified herein. dept-engineering@brentwoodca.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT