Access the Full Project by Clicking here!
Bidjugde
JOB
(CMAR) Services Chandler Heights Road Utility Relocations
BID DATE
12/14/21 - 12:00
AGENCY
Chandler
ESTIMATE
n/a
SCOPE
The project description is for relocation of existing City-owned utilities within City Right-Of-Way through a designated corridor in the southwest part of the City for future critical infrastructure. The 35-40-ft wide clear corridor is generally identified as just east of the intersection of Arizona Avenue and Chandler Heights Road, along Chandler Heights Road to Alma School Road, Alma School Road to Lake Drive, Lake Drive to Chaparral Way, Chaparral Way to Dobson Road. The wet utilities currently identified to be relocated include existing 8-inch to 12-inch diameter gravity sewer pipelines, 6-inch to 16-inch diameter reclaimed water pipelines, 12-inch to 24-inch storm water pipelines and 6-inch to 16-inch diameter potable water pipelines. Other modifications to the existing reclaimed water system and potable water system to facilitate current customers and future development may be included. The wet utilities placed out of service as part of this project will be abandoned-in-place. Minor roadway improvements impacted by wet and dry utility relocation may be included in the scope. paula.brown@chandleraz.gov
UPDATES