Access the Full Project by Clicking here!
Bidjugde
JOB
CLCWA Sanitary Sewer Phase 87 Rehabilitation
BID DATE
07/27/21 - 1:00
AGENCY
Clear Lake City Water Authority
ESTIMATE
n/a
SCOPE
In general, Part 1 work consists of: Pre-television of lines to be repaired by point repair, combination repair, service repair, mechanical cleaning, or cured-in-place pipe. Pipebursting of sanitary sewer lines including service reconnections in kind, drop stack reconnections, and cleanout replacements. Rehabilitation of a cast iron, sanitary sewer line with heavy tuberculation and an abandoned TV cable. Majority of which is under pavement with a covered clean out. Rehabilitation of sanitary sewer lines by mechanical cleaning, point repair, internal point repair, combination repair, and/or service repair. Rehabilitation of sanitary sewer lines by cured-in-place pipe installation. Site restoration including removal and replacement of damaged sidewalks, driveways, concrete patios, wooden decks, pavement, irrigation lines, turf, plants, shrubs, fences, trees, and other miscellaneous items. Trench safety as required per Section 01561, implementation and maintenance of traffic control, and bypass pumping, as necessary, throughout the project. In general, Part 2 work consists of: Removal and replacement of existing 3-inch force main with 3-inch galvanized steel pipe, including all fittings, and stainless-steel straps for securing to existing bridge crossing pipe supports. Contractor to complete connections as close as possible to slope paving, utilizing Hymax fittings or approve equal, in order to replace the maximum amount of existing pipe replaced. Contractor to coordinate with Operator to temporarily suspend lift station discharge into force main while performing work. Site restoration including removal and replacement of damaged sidewalks, driveways, pavement, irrigation lines, turf, plants, shrubs, fences, trees, and other miscellaneous items. Implementation and maintenance of traffic control, as necessary. https://www.civcastusa.com/project/60e85b198e4637c1373f9deb/summary ADPence@lan-inc.com
PREBID
7/20/2021 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT