Hargrave Street Sewer Repair
BID DATE
07/8/14 - 11:00
AGENCY
Banning
ESTIMATE
n/a
SCOPE
The scope of work under this project includes the repair of a 15” vitrified clay pipe (VCP) sewer main including excavation, trench repair, bypass of sewer flows and traffic control all per the City of Banning Standards. The Contractor must comply with all NPDES requirements to reduce storm water run-off by implementing applicable BMPs, as required by the Public Works Inspector. Arturo Vela, P.E. Senior Engineer 951-922-3130 avela@ci.banning.ca.us

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT