Access the Full Project by Clicking here!
Bidjugde
JOB
Water Plant No 1 Phase 1
BID DATE
07/22/21 - 10:00
AGENCY
Fort Bend County MUD
ESTIMATE
$3,900,000
SCOPE
The work includes construction of one (1) gravel packed well with foundation; one (1) factory coated bolted steel ground storage tank with foundation; two (2) hydropneumatic tanks including foundation; three (3) horizontal split case booster pumps with foundations; one (1) 20,000 gallon hydropneumatic tank including foundationone (1) diesel generator with sound attenuated enclosure and ATS, fuel tank, and foundation; pre-engineered canopy; three (3) fiberglass reinforced plastic chemical feed buildings with foundation; disinfection equipment with chemical injection lines; plant piping; electrical, instruments, and control work including service; protective coatings; concrete pavement, driveway and sidewalks; wood fence and gate; site grading and drainage, drainage swales and slope paving; plugging the existing off-site water well; hydro-mulch seeding; temporary fencing; and all additional items shown on the construction plans or needed for a completely functional water plant and water well. https://www.civcastusa.com/project/60dda9dfc1f343130214f726/summary accountspayable@jonescarter.com
PREBID
7/8/2021 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT