2018 Bond Year 3 Contract 6 Unit 1 Unit 3
BID DATE
08/5/21 - 1:30
AGENCY
Fort Worth
ESTIMATE
n/a
SCOPE
3295 LF – 12” Water Line by Open Cut 2314 LF – 8” Water Line by Open Cut 13 EA – 12” Gate Valve 11 EA – 8” Gate Valve 8 EA – Fire Hydrant 74 EA – 1” Water Service 2,185 SY – 11” Pavement Pulverization 1030 LF 42" Fiberglass Sewer Pipe by Open Cut 2247 LF 24" Sewer Pipe by Open Cut 1323 LF 8" Sewer Pipe by Open Cut 16 EA 4’ Manhole 8 EA 5’ Manhole 9 EA 6’ Manhole 27 EA 4” Sewer Service 1,980 SY – 11” Pavement Pulverization 10,210 LF – 6” Concrete Curb and Gutter 13,248 SF – 6” Concrete Driveway 14,920 SY – 11” Pavement Pulverization 14,920 SY – 3” Asphalt Pavement 8,200 SF – 4” Concrete Sidewalk Maged.Zaki@fortworthtexas.gov https://www.fortworthtexas.gov/departments/finance/purchasing/bids/manual-bids/tranp/2021/2018-bond-year-3%E2%80%93contract-6-unit-1%E2%80%93water-improvements-unit-2%E2%80%93sanitary-sewer-improvements-and-unit-3-paving-improvements