Cactus II Feeder Phase 1
BID DATE
08/2/21 - 5:00
AGENCY
Eastern Municipal WD
ESTIMATE
$15,000,000
SCOPE
The Work comprises construction of approximately 10,400 linear feet of transmission main pipeline ranging from 42-inch to 30-inch diameter, approximately 200 linear feet of transmission pipeline laterals ranging from 18-inch to 8-inch diameter, and approximately 1,100 linear feet of distribution pipeline ranging from 12-inch to 6-inch diameter. The Work includes installation of Turnout No. 1 at the Heacock/Pettit Pump Station Site and Turnout No. 2 on Perris Boulevard north of Bay Avenue, including all piping, valving, instrumentation, control, electrical, new SCE service and all turnout appurtenances. A pressure zone conversion from the 1680 PZ to the 1764 PZ is also included in the Work. https://www.emwd.org/rfp-post/spec-1315w-cactus-ii-feeder-phase-1 lloydj@emwd.org
PREBID
7/13/2021 10:00