Sand Hollow State Park Culinary Pipeline Replacement
BID DATE
07/1/21 - 2:00
AGENCY
Washington County Water Conservancy District
ESTIMATE
n/a
SCOPE
The project will consist of the installation of approximately 7,700 lineal feet of 10” ductile iron, 220 lineal feet of 8” ductile iron pipe, and 950 lineal feet of 6” ductile iron pipe with associated valves and fittings, air/vacuum valve assemblies, retrofitting of one pressure reducing valve vault, and asphalt removal and replacement. The project is located in Sand Hollow State Park in Hurricane, Utah. The contractor will be responsible for disposal of any removed pipe, asphalt, and construction debris. sandy@wcwcd.org