Access the Full Project by Clicking here!
Bidjugde
JOB
Paving DFCM TSOB Pavement Upgrades
BID DATE
07/19/21 - 5:00
AGENCY
DFCM
ESTIMATE
$300,000
SCOPE
Project will be to replace old asphalt and improve drainage in the parking lot. Sawcut existing asphalt; Remove existing asphalt pavement; Remove existing road base / subgrade to 11" below finish grades; Remove and dispose of existing bike racks; Sawcut and remove existing curb and gutter; Sawcut and remove existing sidewalks; Cut and remove existing tree roots; Over excavate an additional 12" of soft subgrade and fill with pit-run material; Provide and install stabilization fabric; Sawcut top of existing catch basins to install concrete apron with new grate and frame; Provide and install new curb & gutter; Provide and install new 3'-0" wide concrete waterway; Provide and install ADA accessible ramp; Install 8" road base; Install 3" asphalt; Install 4" wide parking stall striping; Flush system and clean-out debris from existing storm drain catch basins; Misc. repair sod, added topsoil, sprinkler system, etc. in areas of construction as needed; General Conditions; Project mobilization; Erosion control, sweep, and dust control; Construction survey and staking; Traffic control and pedestrian safety. Tim Christensen +1 385-226-2422 timchristensen@utah.gov
UPDATES