Access the Full Project by Clicking here!
Bidjugde
JOB
DEMA Camp Navajo Road Maintenance Repair
BID DATE
07/27/21 - 3:00
AGENCY
AZDEMA
ESTIMATE
n/a
SCOPE
The work is described as, but not limited to; surveying the existing paved road for line and grade prior to any demolition, utilizing this data to re-establish line and grade. Milling and removal of existing Asphalt Concrete (AC). Milling and removal of existing Aggregate Base Coarse (ABC) material as needed, placing the milled AC and ABC in separate stockpiles in a centrally located area identified by the Owner. The haul route should not exceed 5 miles round trip. Re-install the Owner Provided ABC as needed to line, and grade as determined by pre survey and as staked by survey crew. Place 22’ wide x 4” thick AC in 2 lifts of 2” each. Rebuild shoulders at 2’ minimum width by 4” minimum depth each side of roadway using reprocessed ABC or millings provided by owner. Fog Seal AC as specified within 48 hours of placing AC, Strip 4” double yellow centerlines 48 hours or more after Fog Seal. lisa.ledbetter@azdema.gov
UPDATES