Access the Full Project by Clicking here!
Bidjugde
JOB
Sweetwater Village CD
BID DATE
07/28/21 - 11:00
AGENCY
Lazy Nine MUD
ESTIMATE
n/a
SCOPE
RCP drainage piping, including approximately 18”- 48” pipe, manholes and appurtenances; Water piping, including 8” - 12” mains, valves and appurtenances; Wastewater piping consisting of 1.5” - 3” force mains, and appurtenances; Multiple Water Quality Ponds with Irrigation; Booster Pump Station and Ground Storage Tank, Paving, sidewalk, curb and gutter, signing and striping; Excavation and embankment; and Sedimentation and Erosion Control Improvements https://www.civcastusa.com/project/60d7776ebe6743ab9e3ff56e/summary ILeal@bgeinc.com
UPDATES