Access the Full Project by Clicking here!
Bidjugde
JOB
RO Water Campus Brine Pond
BID DATE
07/14/14 - 3:00
AGENCY
Gila Bend
ESTIMATE
n/a
SCOPE
Town of Gila Bend Water System – Reverse Osmosis Brine Disposal Facility. The work generally consists of excavation of brine pond and the installation of a Type 3 General Lined Impoundment to increase the overall capacity of the existing Evaporation Area. The contractor will also be responsible for the procurement and installation of a site security fence with access gate, and an 8-inch C900 PVC Pipe for conveying the brine waste to the new evaporation area. Currently the Reverse Osmosis System Disposal Facility consists of two (2) lined impoundments that total just under 7 acres of Evaporation Area. The new Brine Pond will be approximately 7 acres and will have a 60 mil HDPE geomembrane liner. Attention: Beverly Turner, Town Clerk Phone: (928) 683-2255 Email: bturner@gilabendaz.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT