Access the Full Project by Clicking here!
Bidjugde
JOB
Alliance Regional Water Authority Phase 1B Booster Pump Station Delivery Points
BID DATE
08/3/21 - 2:00
AGENCY
Alliance Regional Water Authority
ESTIMATE
$20,000,000
SCOPE
The Project has been designed by Freese and Nichols, Inc. The Project is anticipated to include some or all of the following items within its scope: a new 4.0 MG concrete ground storage tank (alternate bid as a 5.0 MG tank), a new outdoor pump station consisting of four 2,100 gpm vertical turbine pumps and three 1,600 gpm vertical turbine pumps, the pump can and piping for three additional, future 2,600 gpm pumps, new flow meter vaults, stormwater detention pond and drainage improvements, 12-inch, 18-inch, 24-inch, 36-inch, 42-inch, and 48-inch piping, seven new flow control valves, an access road, new electrical building, new generator foundation pad and generator, seven customer delivery point facilities including control valve, flow meter, and connections to existing piping and ground storage tanks as applicable, and associated electrical / SCADA / instrumentation improvements; and all other appurtenances necessary to complete the Project. https://www.civcastusa.com/project/60ca22d46c1e234cb68be861/summary nathan.cobler@kimley-horn.com
UPDATES