Access the Full Project by Clicking here!
Bidjugde
JOB
Alliance Regional Water Authority Phase 1B Treated Pipeline Segment A
BID DATE
08/3/21 - 3:30
AGENCY
Alliance Regional Water Authority
ESTIMATE
$35,000,000
SCOPE
Treated Pipeline Segment A begins at the future ARWA Water Treatment Plant near SH-304 and Wolf Run Rd (CR 156). The project continues west crossing multiple county roads, state highways, and Plum Creek. The project includes a connection to a future Lockhart Delivery Point and terminates near FM 1322, where Segment B begins. The Work shall include furnishing all tools, labor, materials, equipment, and miscellaneous items necessary for the complete construction of approximately 89,000 LF of 42-/48-inch water line and appurtenances. The project location and pipeline route are indicated in the Drawings. The Work also includes approximately 1,500 LF of trenchless construction, including the crossing of Plum Creek. A Geotechnical Baseline Report for the Plum Creek Crossing is provided in Appendix D. See Drawings and Special Specifications for further requirements. A Geotechnical Data Report for the project is provided in Appendix E. The Work also includes a parallel fiber optic installation. In addition to the Segment A alignment, the parallel fiber installation also includes ARWA’s raw water infrastructure, the Water treatment Plant site, the Segment B pipeline, and the Booster Pump Station site, totaling approximately 158,000 LF. The ocations of all fiber optic work are indicated in the Drawings. https://www.civcastusa.com/project/60ca49656c1e2398b2a4b81b/summary nathan.cobler@kimley-horn.com
UPDATES