JOB
University Ridgeline Intersection Improvements University Widening Ridgeline I 405 Fwy
BID DATE
08/10/21 - 10:00
AGENCY
Irvine
ESTIMATE
$5,200,000
SCOPE
Cold milling, roadway excavation and paving; removal and replacement of asphalt pavement, concrete curb, gutter, curb ramps, driveways and sidewalk; grading and construction of check dams, rip rap protection and storm drain pipe and structures; retaining wall; utility protection, relocation, cooperation and coordination; pavement delineation and signing; traffic signal modification; construction and adjustment of IRWD and other utility facilities; adjusting valve covers and manhole covers to grade, and other items not mentioned here, but are required by the Plans and the Special Provisions. https://pbsystem.planetbids.com/portal/15927/bo/bo-detail/84439 Brian D. Brown, CPSM bbrown@cityofirvine.org