Access the Full Project by Clicking here!
Bidjugde
JOB
Miscellaneous Sewer Rehabilitation
BID DATE
07/2/21 - 2:00
AGENCY
Millbrae
ESTIMATE
n/a
SCOPE
Removal and replacement of existing 6-inch sewer mains with 6-inch or 8-inch sewer mains using pipe reaming, pipe bursting, horizontal directional drilling (HDD), and open cut pipe replacement construction methods, sewer lateral reconnections & replacement, sewer manhole reconnections, cleanout and/or backflow prevention devices, sewer manhole installations and rehabilitation, surface restoration, traffic control, mobilization, manhole modifications, sewage bypassing and all other work as shown on the Plans and as called for in the Technical Provisions and as directed by the Engineer. https://pbsystem.planetbids.com/portal/46991/bo/bo-detail/83899#bidInformation Bill Giang bgiang@ci.millbrae.ca.us
PREBID
6/17/2021 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT