Access the Full Project by Clicking here!
Bidjugde
JOB
Paving Utah State Fairpark Yellow Slide Grandstand Areas
BID DATE
06/30/21 - 3:00
AGENCY
State Utah
ESTIMATE
$890,000
SCOPE
This project mostly consists of removing bad pavement and regrading to improve drainage with new asphalt. General Conditions, Erosion Control, Traffic Control / Pedestrian Safety, Construction Survey & Staking Sawcut and remove asphalt and road base down 11 inches, Over excavate soft subgrade and fill with pit-run material, Provide and install stabilization fabric, Remove and replace existing utility boxes, Provide and install new precast catch basin with concrete apron, Remove, store, and reinstall existing grate and frame into new concrete apron. Sawcut top catch basin as required for extension. Provide and install new 12" RCP storm drain line, New dry well rings w/ 25'x25' gravel, Provide and install new 3'-0" wide concrete waterway, install 6"x6" concrete mow strip, install 6" thick concrete pad beneath large tent area, install 6" thick concrete pads for additional tent areas, install 8" road base, install 3" asphalt, Flush system and clean-out debris from new and existing storm drain catch basins. Tim Christensen +1 385-226-2422 timchristensen@utah.gov
PREBID
6/17/2021 11:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT