Access the Full Project by Clicking here!
Bidjugde
JOB
Groundwater Flush Waste
BID DATE
08/4/21 - 2:00
AGENCY
Sacramento
ESTIMATE
$4,910,000
SCOPE
Well upgrade improvements include installing new automated chemical dosing and water quality analyzer systems, motor operated valving, 6-inch to 10-inch diameter discharge piping fabrication and installation, surface restoration and paving, switchgear relocation and installation, pump and motor replacement with new adjustable frequency drive (AFD), electrical upgrades, perimeter fencing installation, existing CMU building modifications and roofing installation, and wellhead rotation and rebuild modifications. Work also includes removing and replacing water mains and connecting to the existing distribution system as indicated on the Plans which includes excavation, backfill and surface restoration associated with the installation of the water mains, as well as furnishing and installing fittings, valves, and other appurtenances. https://pbsystem.planetbids.com/portal/15300/bo/bo-detail/83794 Colleen Karbowski 916-808-1474 CKarbowski@cityofsacramento.org
UPDATES