Access the Full Project by Clicking here!
Bidjugde
JOB
Rabbit Creek Lift Station Improvements
BID DATE
07/23/21 - 9:30
AGENCY
Kilgore
ESTIMATE
$3,300,000
SCOPE
The Project consists of performing Rabbit Creek Lift Station Improvements including but not limited to, mobilization, bonds and insurance; demolition of the existing wet well top slab; construction of a new wet well top slab; three (3) submersible pumps with accessories, piping, valves, fittings, and supports; protective coatings; elevated transformer walkway; one (1) 400 kW diesel engine driven generator; sound attenuated weatherproof level 2 enclosure; elevated electrical equipment and generator walkway; automatic transfer switch, distribution panel, SCADA panel, electrical service disconnect switches, VFDs, conduit, wire and associated piping; site work; and all else shown on the construction drawings and detailed in the specifications for a fully functioning lift station. https://www.civcastusa.com/project/60c268490c86463ca451ea07/summary public.works@cityofkilgore.com
PREBID
6/30/2021 9:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT