Access the Full Project by Clicking here!
Bidjugde
JOB
Madrone Canyon
BID DATE
07/20/21 - 11:00
AGENCY
Wylie
ESTIMATE
n/a
SCOPE
Scope of Work of the Contract includes the following: Drainage improvements including approximately 18”- 66” Reinforced Concrete Pipe & Headwalls, Concrete Box Culverts and Headwalls; Water piping, including 8” - 12” mains, valves and appurtenances; Wastewater piping consisting of 1.5” - 4” force mains and appurtenances; Water Quality Detention Ponds and Vegetative Filter Strips, Paving, Sidewalk, Curb and Gutter, Signing and Striping; Excavation and Embankment; and Sedimentation/Erosion Control Improvements, and various other items. https://www.civcastusa.com/project/60b92bc2be6743d303778f9f/summary ileal@bgeinc.com
UPDATES