Access the Full Project by Clicking here!
Bidjugde
JOB
Meadow Lake Blvd Street Extension
BID DATE
06/24/21 - 3:00
AGENCY
Austin
ESTIMATE
$2,480,000
SCOPE
The proposed 1,240 LF roadway includes two vehicular travel lanes with parallel parking and sidewalk on both sides. A two-way bicycle lane runs along the west side of the road and is protected by intermittent barrier curb. A proposed waterline runs the entire length of the road and connects to existing waterline at both ends. https://www.austintexas.gov/financeonline/account_services/solicitation/solicitation_details.cfm?sid=135283 adriana.ybarra2@austintexas.gov
PREBID
5/27/2021 11:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT